Press

Press


31.08.2012

Grand Stade Lille Métropole – Articles CCI

Our know-how continues to be exported. Discover the implementation of the removable roof of the Pierre Mauroy stadium in Villeneuve d'Ascq.

Read more >

20.02.2011

Terminal S4 – Roissy Charles de Gaulle Airport

After the post office building built in 2003 on the Roissy Charles de Gaulle airport site, our company was selected to carry out the waterproofing.

Read more >

30.03.2010

Euro Space Center

Discover the photovoltaic membrane system integrated into the waterproofing used during the renovation of the roof of the buildings of the Euro Space Center in Redu.

Read more >

01.04.2006

Atomium – Article

In 2006, during the cladding of the Atomium in stainless steel, we were commissioned to renovate the roof of the reception pavilion located at the foot of it.

Read more >